Projects

Big Bear Concrete Sump

• Services Provided: Formed and poured a new concrete sump, fabricated all walkways, and fabricated all pipes to tie-in to existing pump lines
• Project Duration: 7 months
• Crew Size: 6-9 employees

BRRD Subtitle C Landfill Expansion

• Services Provided: Cell 7 Secondary Slag Landfill addition. Construction consisted of landfill subsurface grading and shaping, dynamic compaction followed with clay liner placement, shaping and compaction, geosynthetic liner install, drainage sand layer install with integrated leachate collection systems
• Project Duration: 7 months
• Crew Size: 12-20 employees

Casteel Concrete Sump

• Services Provided: Formed and poured a new concrete sump, fabricated all walkways, and fabricated all pipes to tie-in to existing pump lines
• Project Duration: 9 months
• Crew Size: 6-9 employees

Concrete Enclosure Lead house – Sweetwater and Buick

• Services Provided: Formed and poured concrete floor and walls for the new lead house enclosures
• Project Duration: 14 months
• Crew Size: 10 – 14 employees

Glover Site Remediation

• Services Provided: Remediation activities involving 12-24” pasture remediation, approximate 6,000 creek remediation involving working closely with MoDNR and the Army Core of Engineers, slag pile capping and closure
• Project Duration: 9 months
• Crew Size: 4-10 employees

Railveyor

• Services Provided: Flew to Canada to view a Rail Veyor system in a gold mine. I was the Project Manager working directly with representatives from Rail Veyor. I have a full understanding of all aspects of the process. We came up with the idea to crush the rock underground that was used as bedding for the areas for rail installation. Installed and fabricated concrete pads where we installed the drive stations. We installed 5 miles of tracks and rail cars. I reported directly to the Doe Run Project Supervisor Steve Dismuke in weekly progress meetings.
• Project Duration: 11 months
• Crew Size: 6-10 employees

St. Joe State Park Crossing construction and Spillway Construction

• Services Provided: Concrete culvert crossings formed and constructed in place through drainage areas to allow access throughout the park. Project also involved constructing and armoring retention basin spillway with riprap and shotcrete placement
• Project Duration: 2 months
• Crew Size: 4-6 employees

Yard Remediation – S&L

• Services Provided: On-road trucking services, contract operators and laborers provide to perform residential yard remediation for OU-1.
• Project Duration: 24 months
• Crew Size: 42 - 48 employees